EI Electronics HQ
Standort

Irland

Jahr

2022

Gebäudetyp

Büro-/Geschäftsgebäude

Architekt

ONOM Galway

Kunde

EI Electronics

Metallbauer

Alutec Facades

Fotograf

DOD Photography

Weitere Planungsbeauftragte

General Contractor - Monami

Verwendete Systeme

Façades WICTEC, Doors WICSTYLE

R5__8355-HDR.jpg

Projektdetails

The €19.5m Guinee Building boasts an ultra-modern design throughout. Glazing features prominently, not least in the form of the curtain walling that dominates the facade. Products made with Hydro CIRCAL recycled aluminium was the perfect choice for this application.

Made with a minimum of 75% recycled post-consumer aluminium, Hydro CIRCAL takes end-of-life materials and turns them into a high-quality aluminium billet. Using recycled post-consumer aluminium dramatically reduces the amount of energy used and carbon dioxide released during the manufacturing process. This made it the ideal material to support both EI Electronics’s environmental values and the architectural vision for the building.

To achieve that vision, O’Neill-O’Malley needed a high-quality aluminium system that was in keeping with the modern aesthetics and quality finishes apparent throughout the building. WICONA supplied two products to match that design intent.

With an extra-narrow 50mm face width inside and outside, the WICTEC 50 stick system curtain wall gives the strength and structure needed while also preserving the aesthetics of the glazed facade. It also delivers the flexibility needed to accomplish the curved glazing that creates eye-catching focal points around the building. The soft, rounded lines drawn up in the architectural plans are preserved in the finished building.

WICONA also supplied the high-insulation WICSTYLE 65 Evo door system, which extends the narrow sightlines and contemporary look of the glazed exterior into the sash doors of the Guinee Building’s entrances and exits. By using recycled, end-of-life aluminium and energy-efficient thermal insulation connections, both the design and sustainability requirements of the building were met.

R5__8381-HDR.jpg
R5__8410-HDR.jpg
R5__8423.jpg
R5__8443.jpg
R5__8468.jpg
R5__8349-HDR.jpg
The project was a big success. The fact that no changes were required highlights WICONA’s proficiency in addressing complex design elements and structural challenges. Everything was done right the first time, and that’s why WICONA is a preferred partner for projects of this nature. The successful integration of curved glass and the installation of heavy glazed panels showcases their expertise and precision. Together, we created a facade that safely and securely captured the design.

Façades WICTEC

WICTEC 50

Erfahren Sie mehr WICTEC 50

WICTEC 50

Doors WICSTYLE

WICSTYLE 65 evo

Erfahren Sie mehr WICSTYLE 65 evo

WICSTYLE 65 evo

Weitere Referenzen

Unsere Referenzen

Hampton by Hilton Barcelona Fira Gran Vía
Hampton by Hilton Barcelona Fira Gran Vía
Cineplex
Cineplex
Hotel Kempinski
Hotel Kempinski