The Cube Birmingham
Location

Birmingham, United Kingdom

Year

2010

Building Type

Public buildings

Architect

Make Architects - info@makearchitects.com - 32 Cleveland Street - W1T 4AH - London - United Kingdom - http://www.makearchitects.com/

Customer

HAGA Metallbau - info@haga-metallbau.de - 97461 - Hofheim i. Ufr. - Germany - http://www.haga-metallbau.eu/

Used systems

Façades WICTEC

101130_The Cube images13_credit Craig Holmes.jpg

PROJECT DETAILS

The Cube was the final phase of Birmingham's highly successful Mailbox development and features a dramatic facade created using 20,000 unitised panels. 

This is an exceptional £100m, 23-storey mixed-use scheme, that pushed the boundaries of design and construction. The 42,000m² development was inspired by the jewellery and engineering heritage of the city and is based on the concept of a jewellery box. 

The bespoke facade was constructed using unitised curtain walling and provides a geometric blend of projecting gold, silver and bronze anodised aluminium panels and glass. This intricate design is complemented by a decorative metallic fretwork screen. 

The 20,000 panels have three different depths, casting a variety of shadows to add texture to the external facade. The internal elevations are different, but no less dramatic, designed to emphasise the jewels within the box. Glazed unitised panels twist up through a central courtyard and explode at the top to crown the building with the city's first rooftop bar and restaurant.

The Cube is a high profile mixed-use project, which has a low-energy design. Modular cladding gave architects the flexibility to tailor the glazing on the external and internal elevations in response to potential solar gain, providing a high degree of insulation and airtightness, as well as a low U value facade. 

This project created a spectacular new entrance to the canal network and city centre, accomodating a 44-bedroom boutique hotel, four floors of waterside retail and restaurants, 244 apartments, Grade A offices, a rooftop restaurant and a sky bar.

101130_The Cube images8_credit Zander Olsen-Make.jpg
101130_The Cube images7_credit Zander Olsen-Make.jpg
101130_The Cube images2_credit Craig Holmes.jpg
101130_The Cube images1_credit Craig Holmes.jpg
101130_The Cube images13_credit Craig Holmes.jpg
101130_The Cube images11_credit Craig Holmes_02.jpg
gallery_1011302_The Cube images2_credit Craig Holmes.jpg
Wicona Cube image13_credit Craig Holmes.jpg
HAGA P1020273.jpg
HAGA P1020248.jpg
HAGA P1020236.jpg
HAGA P1020235.jpg

Façades WICTEC

WICTEC 50

WICTEC EL evo

Find more about WICTEC 50
Find more about WICTEC EL evo

WICTEC 50

WICTEC EL evo

Other references

Other References Reference page

Järnvägens Hus
Järnvägens Hus
SWU - Service Center Neue Mitte Ulm
SWU - Service Center Neue Mitte Ulm
Hedin Bil
Hedin Bil

SUSTAINABLE SOLUTIONS

See how we can help your project meet sustainability standards.

Contact us