Centre aquatique de l’estuaire Aquaparc
Location

Saint-Nazaire, Fransa

Yıl

2018

Yapı türü

Kültürel

Mimar

Coste Architectures - France

Customer

Seralu - France

Photographer

Patrick Loubet - Photographe - France

Other planning committee

SONADEV, in the name and on behalf of CARENE - Maîtrise d'ouvrage - France / GD ECO - Economiste - France

Used systems

Doors WICSTYLE

centre-aquatique-st-nazaire-estuaire-aquaparc-slider-picture.jpg

PROJECT DETAILS

The design is part of an environmental approach optimising energy management and the visual, acoustic and hygrothermal comforts adapted to this type of building. The hall with its five pools (1,267 m2 of water) opens up onto the outdoor beaches and the landscaped park through a south-east façade entirely glazed under three shed-like roofs with zenithal lighting between them.

WICONA's prescription team has supported Coste Architectures from the design phase of the project in 2015 - one of the first in France to be fully modelled in BIM (BIM d'or in 2014).

centre-aquatique-st-nazaire-estuaire-aquaparc-2.jpg
centre-aquatique-st-nazaire-estuaire-aquaparc-1.jpg
centre-aquatique-st-nazaire-estuaire-aquaparc-3.jpg
centre-aquatique-st-nazaire-estuaire-aquaparc-4.jpg
centre-aquatique-st-nazaire-estuaire-aquaparc-5.jpg
centre-aquatique-st-nazaire-estuaire-aquaparc-6.jpg

Doors WICSTYLE

WICSTYLE 77 FP

Find more about WICSTYLE 77 FP

WICSTYLE 77 FP

Other references

Reference page

Swiss Re Germany AG
Swiss Re Germany AG
ORMOND QUAY
ORMOND QUAY
Accademia di Architettura - Mendrisio
Accademia di Architettura - Mendrisio

CONTACT US

Are you looking for professional advice? Do you have a suggestion that you would like to share with us? Get in contact with an expert by clicking on the link below.

İletişim