DNB Bygg C
Location

Oslo, Norway

Year

2013

Building Type

Office buildings

Used systems

Façades WICTEC, Windows WICLINE, Doors WICSTYLE

DnB_DSC9450.jpg

PROJECT DETAILS

DNB has tentatively scheduled three different buildings on the east side of the MAD-building, and overall they go under the designation DNB complex. They are connected below ground and totaled approximately 80 000 square meters of floor space. The building was designed in collaboration with DARK Arkitekter AS, a lab and MVRDV and is expected to be completed by 2012 and 2013. It is estimated that around 4000 employees to work in this complex.
lo-res_DSC9566.jpg
lo-res_DSC9554.jpg
lo-res_DSC9462.jpg
lo-res_DSC9447.jpg
lo-res_DSC9082.jpg
lo-res_DSC9072.jpg
lo-res_DSC9056.jpg

Façades WICTEC

WICTEC 50

WICTEC 50 A

Find more about WICTEC 50
Find more about WICTEC 50 A

WICTEC 50

WICTEC 50 A

Windows WICLINE

WICLINE 75 evo

Find more about WICLINE 75 evo

WICLINE 75 evo

Doors WICSTYLE

WICSTYLE 75 evo

Find more about WICSTYLE 75 evo

WICSTYLE 75 evo

Other references

Reference page

Hotel ETAP
Hotel ETAP
Palais des Festivals
Palais des Festivals
Arkéos
Arkéos

联系我们

是否正在寻找专业解决方案?又或者你有建议要和我们分享? 请点击下面链接与我们联系。